Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 74313 REL 38: 1988-053-08 EXP HRPP ODFW HATCHERY OAK SPRINGS
Project Number:
Title:
Hood River Production Operations and Maintenance (O&M) and Powerdale
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Gorge Hood 100.00%
Contract Number:
74313 REL 38
Contract Title:
1988-053-08 EXP HRPP ODFW HATCHERY OAK SPRINGS
Contract Continuation:
Previous: Next:
74313 REL 9: 1988-053-08 EXP HRPP ODFW HATCHERY OAK SPRINGS
  • 74313 REL 63: 1988-053-08 EXP HRPP ODFW HATCHERY OAK SPRINGS
Contract Status:
Closed
Contract Description:
The Oregon Department of Fish  and Wildlife (ODFW) will operate the incubation, early rearing and raceway ponds at Oak Springs Fish Hatchery that are designed for the production of Hood River winter steelhead. The hatchery manager will be responsible for all phases of the steelhead rearing program, including: isolation incubation and early rearing, disease prevention and treatment, fin marking, and transfer of 50,000 winter steelhead smolts to Hood River acclimation facilities, this hatchery production will require close coordination with other Hood River Production Project personnel, from both ODFW and the Confederated Tribes of Warm Springs (CTWS). Coordination will include correct external marking, achieving smolt size objective at the pre-determined time of release, and delivery of fish to acclimation facilities. The ODFW Watershed Coordinator will supervise the hatchery manager.

Acronyms:
HMIS:  Hatchery Management Information System
IHOT:  Integrated Hatchery Operations Team
IHN:  Infectious Hematopoietic Necrosis
Account Type(s):
Expense
Contract Start Date:
10/01/2018
Contract End Date:
09/30/2019
Current Contract Value:
$167,491
Expenditures:
$167,491

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Documentation of environmental compliance completed B: 165. NEPA and ESA compliance for project work 09/30/2019 09/13/2019
BPA project administration activities complete C: 119. Manage Project 09/30/2019 09/13/2019
Progress toward 50,000 winter steelhead at 5 per pound D: 176. BY 2019 Hood River Winter steelhead (50,000 smolts) 09/30/2019 09/13/2019
Transfer of 50,000 winter steelhead at 5 per pound complete E: 176. BY 2018 Hood River Winter steelhead (50,000 smolts) 05/10/2019 04/29/2019
Mark 100% of steelhead with a goal of 97% mark retention F: 158. Fin clip 100% of BY 2018 steelhead smolts 03/31/2019 03/28/2019
Fully functional fish hatchery to produce quality fish G: 61. Day-to-day and "periodically scheduled" maintenance 09/30/2019 09/13/2019
Ongoing and pre-liberation fish health sampling. H: 60. Periodic fish health sampling 09/30/2019 09/13/2019
Annual Operating Plan uploaded to Pisces I: 174. Annual Operating Plan submitted to BPA 03/31/2019 03/29/2019

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 2 instances of WE 176 Produce Hatchery Fish
  • 1 instance of WE 60 Maintain Fish Health
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 158 Mark/Tag Animals

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 10/01/2018
B 165 NEPA and ESA compliance for project work 10/01/2018
C 119 Manage Project 10/01/2018
D 176 BY 2019 Hood River Winter steelhead (50,000 smolts) 12/03/2019
E 176 BY 2018 Hood River Winter steelhead (50,000 smolts) 12/03/2019
F 158 Fin clip 100% of BY 2018 steelhead smolts 12/03/2019
G 61 Day-to-day and "periodically scheduled" maintenance 12/03/2019
H 60 Periodic fish health sampling 12/03/2019
I 174 Annual Operating Plan submitted to BPA 12/03/2019
J 132 No Annual Report due under this contract 10/01/2018